CC16 Realization Planning

Scope note:

This class comprises the beginning of the evolution of a set of activities that aim towards the articulation of a CC3 Realization Concept, concretized in one or more CC4 Realization Plans, which aim to accurately incorporate a specific set of design documents (instances of CC1 Model) into a plan to realize a creative idea, typically as a physical work (E22 Human-made Object). The instance of this event begins when an actor, such as that designated ‘Maîtrise d'Oeuvre’, starts the activities of formulating the plan towards realization, with or without an external party participating, which may or may not include the ‘Maîtrise d'Ouvrage’. 

Examples:

  • The construction planning for the realization of the One World Trade Centre (E22) in New York, undertaken by Tishman Construction (E74) based on the final designs (CC1) of the architect Daniel Libeskind (E21). (https://www.architectmagazine.com/design/one-world-trade-center)
  • The planning activities for the casting of Rodin’s “Gates of Hell” (E22), undertaken by Léonce Bénédite (E21), 1917 - 1926, based on the composition proposed by Rodin (E21) in the plaster of 1889 (CC1). (http://rodin-web.org/works/1880_gates.htm)

In First Order Logic:

  • CC16(x) ⇒ F27(x)

Scope notes

Show Scope note Language Namespace View details Comments
This class comprises the beginning of the evolution of a set of activities that aim towards the articulation of a CC3 Realization Concept, concretized in one or more CC4 Realization Plans, which aim to accurately incorporate a specific set of design documents (instances of CC1 Model) into a plan to realize a creative idea, typically as a physical work (E22 Human-made Object). The instance of this event begins when an actor, such as that designated ‘Maîtrise d'Oeuvre’, starts the activities of formulating the plan towards realization, with or without an external party participating, which may or may not include the ‘Maîtrise d'Ouvrage’.  en CRM for Creative Processes Representation Version 1.5 0

Examples

Show Example Language Namespace View details Comments
The construction planning for the realization of the One World Trade Centre (E22) in New York, undertaken by Tishman Construction (E74) based on the final designs (CC1) of the architect Daniel Libeskind (E21). (https://www.architectmagazine.com/design/one-world-trade-center) The planning activities for the casting of Rodin’s “Gates of Hell” (E22), undertaken by Léonce Bénédite (E21), 1917 - 1926, based on the composition proposed by Rodin (E21) in the plaster of 1889 (CC1). (http://rodin-web.org/works/1880_gates.htm) en CRM for Creative Processes Representation Version 1.5 0

Additional notes

Show Notes Type Language Namespace View details Comments

Identifier: CC16

Official URI: https://takin.solutions/ontologies/CRMcpr/CC16_Realization_Planning
OntoME URI: https://ontome.net/ontology/c623

Labels

Label Language Last updated View details Comments
Realization Planning * en 2023-11-05 0

* : Standard label for this language

Parent classes

Class Class namespace Relation defined in Justification View details Edit Delete Comments
F27 Work Conception FRBRoo version 2.4 CRM for Creative Processes Representation Version 1.5 0

Ancestor classes

Class Depth Class namespace Via
E1 CRM Entity 7 CIDOC CRM version 6.2 F27 - E65 - E63 - E5 - E4 - E2
E1 CRM Entity 7 CIDOC CRM version 6.2 F27 - E65 - E63 - E5 - E4 - E92
E1 CRM Entity 7 CIDOC CRM version 6.2 F27 - E65 - E7 - E5 - E4 - E2
E1 CRM Entity 7 CIDOC CRM version 6.2 F27 - E65 - E7 - E5 - E4 - E92
E1 CRM Entity 8 CIDOC CRM version 6.2 F27 - E65 - E63 - E5 - E4 - E2 - S15
E1 CRM Entity 8 CIDOC CRM version 6.2 F27 - E65 - E7 - E5 - E4 - E2 - S15
E2 Temporal Entity 6 CIDOC CRM version 6.2 F27 - E65 - E63 - E5 - E4
E2 Temporal Entity 6 CIDOC CRM version 6.2 F27 - E65 - E7 - E5 - E4
E4 Period 5 CIDOC CRM version 6.2 F27 - E65 - E63 - E5
E4 Period 5 CIDOC CRM version 6.2 F27 - E65 - E7 - E5
E5 Event 4 CIDOC CRM version 6.2 F27 - E65 - E63
E5 Event 4 CIDOC CRM version 6.2 F27 - E65 - E7
E7 Activity 3 CIDOC CRM version 6.2 F27 - E65
E63 Beginning of Existence 3 CIDOC CRM version 6.2 F27 - E65
E65 Creation 2 CIDOC CRM version 6.2 F27
E92 Spacetime Volume 6 CIDOC CRM version 6.2 F27 - E65 - E63 - E5 - E4
E92 Spacetime Volume 6 CIDOC CRM version 6.2 F27 - E65 - E7 - E5 - E4
Thing 8 OntoME internal model - active version F27 - E65 - E63 - E5 - E4 - E2 - E1
Thing 8 OntoME internal model - active version F27 - E65 - E63 - E5 - E4 - E92 - E1
Thing 8 OntoME internal model - active version F27 - E65 - E7 - E5 - E4 - E2 - E1
Thing 8 OntoME internal model - active version F27 - E65 - E7 - E5 - E4 - E92 - E1
Thing 9 OntoME internal model - active version F27 - E65 - E63 - E5 - E4 - E2 - S15 - E1
Thing 9 OntoME internal model - active version F27 - E65 - E7 - E5 - E4 - E2 - S15 - E1
S15 Observable Entity 7 CRMsci version 1.2.3 F27 - E65 - E63 - E5 - E4 - E2
S15 Observable Entity 7 CRMsci version 1.2.3 F27 - E65 - E7 - E5 - E4 - E2

Child and descendant classes

Class Depth Class namespace Via

Related classes

Relation Class Class namespace Justification Relation defined in View details Edit Delete Comments

Outgoing properties (this class is domain)

Domain Property identifier Range Namespace

Outgoing properties (inherited from ancestors)

Domain Property identifier Range Namespace
CC16 Realization Planning (is a E1 CRM Entity ) crm:P1 is identified by (identifies) E41 Appellation CIDOC CRM version 6.2
CC16 Realization Planning (is a E1 CRM Entity ) crm:P2 has type (is type of) E55 Type CIDOC CRM version 6.2
CC16 Realization Planning (is a E1 CRM Entity ) crm:P3 has note E62 String CIDOC CRM version 6.2
CC16 Realization Planning (is a E1 CRM Entity ) crm:P48 has preferred identifier (is preferred identifier of) E42 Identifier CIDOC CRM version 6.2
CC16 Realization Planning (is a E1 CRM Entity ) crm:P137 exemplifies (is exemplified by) E55 Type CIDOC CRM version 6.2
CC16 Realization Planning (is a E2 Temporal Entity ) crm:P4 has time-span (is time-span of) E52 Time-Span CIDOC CRM version 6.2
CC16 Realization Planning (is a E2 Temporal Entity ) crm:P114 is equal in time to E2 Temporal Entity CIDOC CRM version 6.2
CC16 Realization Planning (is a E2 Temporal Entity ) crm:P115 finishes (is finished by) E2 Temporal Entity CIDOC CRM version 6.2
CC16 Realization Planning (is a E2 Temporal Entity ) crm:P116 starts (is started by) E2 Temporal Entity CIDOC CRM version 6.2
CC16 Realization Planning (is a E2 Temporal Entity ) crm:P117 occurs during (includes) E2 Temporal Entity CIDOC CRM version 6.2
CC16 Realization Planning (is a E2 Temporal Entity ) crm:P118 overlaps in time with (is overlapped in time by) E2 Temporal Entity CIDOC CRM version 6.2
CC16 Realization Planning (is a E2 Temporal Entity ) crm:P119 meets in time with (is met in time by) E2 Temporal Entity CIDOC CRM version 6.2
CC16 Realization Planning (is a E2 Temporal Entity ) crm:P120 occurs before (occurs after) E2 Temporal Entity CIDOC CRM version 6.2
CC16 Realization Planning (is a E4 Period ) crm:P7 took place at (witnessed) E53 Place CIDOC CRM version 6.2
CC16 Realization Planning (is a E4 Period ) crm:P8 took place on or within (witnessed) E18 Physical Thing CIDOC CRM version 6.2
CC16 Realization Planning (is a E4 Period ) crm:P9 consists of (forms part of) E4 Period CIDOC CRM version 6.2
CC16 Realization Planning (is a E5 Event ) crm:P11 had participant (participated in) E39 Actor CIDOC CRM version 6.2
CC16 Realization Planning (is a E5 Event ) crm:P12 occurred in the presence of (was present at) E77 Persistent Item CIDOC CRM version 6.2
CC16 Realization Planning (is a E5 Event ) crmsci:O13 triggers (is triggered by) E5 Event CRMsci version 1.2.3
CC16 Realization Planning (is a E5 Event ) crmsci:O14 initializes (is initialized by) S16 State CRMsci version 1.2.3
CC16 Realization Planning (is a E5 Event ) crmact:actP26 matched template (is template for) actE4 Event Template CRM Activity Plans
CC16 Realization Planning (is a E7 Activity ) crm:P14 carried out by (performed) E39 Actor CIDOC CRM version 6.2
CC16 Realization Planning (is a E7 Activity ) crm:P15 was influenced by (influenced) E1 CRM Entity CIDOC CRM version 6.2
CC16 Realization Planning (is a E7 Activity ) crm:P16 used specific object (was used for) E70 Thing CIDOC CRM version 6.2
CC16 Realization Planning (is a E7 Activity ) crm:P17 was motivated by (motivated) E1 CRM Entity CIDOC CRM version 6.2
CC16 Realization Planning (is a E7 Activity ) crm:P19 was intended use of (was made for) E71 Man-Made Thing CIDOC CRM version 6.2
CC16 Realization Planning (is a E7 Activity ) crm:P20 had specific purpose (was purpose of) E5 Event CIDOC CRM version 6.2
CC16 Realization Planning (is a E7 Activity ) crm:P21 had general purpose (was purpose of) E55 Type CIDOC CRM version 6.2
CC16 Realization Planning (is a E7 Activity ) crm:P32 used general technique (was technique of) E55 Type CIDOC CRM version 6.2
CC16 Realization Planning (is a E7 Activity ) crm:P33 used specific technique (was used by) E29 Design or Procedure CIDOC CRM version 6.2
CC16 Realization Planning (is a E7 Activity ) crm:P125 used object of type (was type of object used in) E55 Type CIDOC CRM version 6.2
CC16 Realization Planning (is a E7 Activity ) crm:P134 continued (was continued by) E7 Activity CIDOC CRM version 6.2
CC16 Realization Planning (is a E7 Activity ) crmact:actP15 realised (was realised by) actE2 Activity Plan CRM Activity Plans
CC16 Realization Planning (is a E63 Beginning of Existence ) crm:P92 brought into existence (was brought into existence by) E77 Persistent Item CIDOC CRM version 6.2
CC16 Realization Planning (is a E65 Creation ) crm:P94 has created (was created by) E28 Conceptual Object CIDOC CRM version 6.2
CC16 Realization Planning (is a E92 Spacetime Volume ) crm:P10 falls within (contains) E92 Spacetime Volume CIDOC CRM version 6.2
CC16 Realization Planning (is a E92 Spacetime Volume ) crm:P132 overlaps with E92 Spacetime Volume CIDOC CRM version 6.2
CC16 Realization Planning (is a E92 Spacetime Volume ) crm:P133 is separated from E92 Spacetime Volume CIDOC CRM version 6.2
CC16 Realization Planning (is a E92 Spacetime Volume ) crm:P160 has temporal projection (is temporal projection of) E52 Time-Span CIDOC CRM version 6.2
CC16 Realization Planning (is a E92 Spacetime Volume ) crm:P161 has spatial projection (is spatial projection of) E53 Place CIDOC CRM version 6.2
CC16 Realization Planning (is a F27 Work Conception ) frbroo:R16 initiated (was initiated by) F1 Work FRBRoo version 2.4
CC16 Realization Planning (is a S15 Observable Entity ) crmsci:O12 has dimension (is dimension of) E54 Dimension CRMsci version 1.2.3

Incoming properties (this class is range)

Domain Property identifier Range Namespace

Incoming properties (inherited from ancestors)

Domain Property identifier Range Namespace
E2 Temporal Entity crm:P114 is equal in time to CC16 Realization Planning (is a E2) CIDOC CRM version 6.2
E2 Temporal Entity crm:P115 finishes (is finished by) CC16 Realization Planning (is a E2) CIDOC CRM version 6.2
E2 Temporal Entity crm:P116 starts (is started by) CC16 Realization Planning (is a E2) CIDOC CRM version 6.2
E2 Temporal Entity crm:P117 occurs during (includes) CC16 Realization Planning (is a E2) CIDOC CRM version 6.2
E2 Temporal Entity crm:P118 overlaps in time with (is overlapped in time by) CC16 Realization Planning (is a E2) CIDOC CRM version 6.2
E2 Temporal Entity crm:P119 meets in time with (is met in time by) CC16 Realization Planning (is a E2) CIDOC CRM version 6.2
E2 Temporal Entity crm:P120 occurs before (occurs after) CC16 Realization Planning (is a E2) CIDOC CRM version 6.2
E4 Period crm:P9 consists of (forms part of) CC16 Realization Planning (is a E4) CIDOC CRM version 6.2
E5 Event crmsci:O13 triggers (is triggered by) CC16 Realization Planning (is a E5) CRMsci version 1.2.3
E7 Activity crm:P134 continued (was continued by) CC16 Realization Planning (is a E7) CIDOC CRM version 6.2
E7 Activity crm:P15 was influenced by (influenced) CC16 Realization Planning (is a E1) CIDOC CRM version 6.2
E7 Activity crm:P17 was motivated by (motivated) CC16 Realization Planning (is a E1) CIDOC CRM version 6.2
E7 Activity crm:P20 had specific purpose (was purpose of) CC16 Realization Planning (is a E5) CIDOC CRM version 6.2
E13 Attribute Assignment crm:P140 assigned attribute to (was attributed by) CC16 Realization Planning (is a E1) CIDOC CRM version 6.2
E13 Attribute Assignment crm:P141 assigned (was assigned by) CC16 Realization Planning (is a E1) CIDOC CRM version 6.2
E16 Measurement crm:P39 measured (was measured by) CC16 Realization Planning (is a E1) CIDOC CRM version 6.2
E17 Type Assignment crm:P41 classified (was classified by) CC16 Realization Planning (is a E1) CIDOC CRM version 6.2
E24 Physical Man-Made Thing crm:P62 depicts (is depicted by) CC16 Realization Planning (is a E1) CIDOC CRM version 6.2
E31 Document crm:P70 documents (is documented in) CC16 Realization Planning (is a E1) CIDOC CRM version 6.2
E32 Authority Document crm:P71 lists (is listed in) CC16 Realization Planning (is a E1) CIDOC CRM version 6.2
E36 Visual Item crm:P138 represents (has representation) CC16 Realization Planning (is a E1) CIDOC CRM version 6.2
E83 Type Creation crm:P136 was based on (supported type creation) CC16 Realization Planning (is a E1) CIDOC CRM version 6.2
E89 Propositional Object crm:P129 is about (is subject of) CC16 Realization Planning (is a E1) CIDOC CRM version 6.2
E89 Propositional Object crm:P67 refers to (is referred to by) CC16 Realization Planning (is a E1) CIDOC CRM version 6.2
E92 Spacetime Volume crm:P10 falls within (contains) CC16 Realization Planning (is a E92) CIDOC CRM version 6.2
E92 Spacetime Volume crm:P132 overlaps with CC16 Realization Planning (is a E92) CIDOC CRM version 6.2
E92 Spacetime Volume crm:P133 is separated from CC16 Realization Planning (is a E92) CIDOC CRM version 6.2
E93 Presence crm:P166 was a presence of (had presence) CC16 Realization Planning (is a E92) CIDOC CRM version 6.2
F29 Recording Event frbroo:R20 recorded (was recorded through) CC16 Realization Planning (is a E2) FRBRoo version 2.4
F35 Nomen Use Statement frbroo:R38 refers to thema (is thema of) CC16 Realization Planning (is a E1) FRBRoo version 2.4
F40 Identifier Assignment frbroo:R45 assigned to (was assigned by) CC16 Realization Planning (is a E1) FRBRoo version 2.4
F51 Pursuit frbroo:R59 had typical subject (was typical subject of) CC16 Realization Planning (is a E1) FRBRoo version 2.4
F52 Name Use Activity frbroo:R63 named (was named by) CC16 Realization Planning (is a E1) FRBRoo version 2.4
S4 Observation crmsci:O16 observed value (value was observed by) CC16 Realization Planning (is a E1) CRMsci version 1.2.3
S4 Observation crmsci:O8 observed (was observed by) CC16 Realization Planning (is a S15) CRMsci version 1.2.3
S6 Data Evaluation crmsci:O11 described (was described by) CC16 Realization Planning (is a S15) CRMsci version 1.2.3
S21 Measurement crmsci:O24 measured (was measured by) CC16 Realization Planning (is a S15) CRMsci version 1.2.3
S22 Segment of Matter crmsci:O23 is defined by (defines) CC16 Realization Planning (is a E92) CRMsci version 1.2.3
actE3 Intention to Apply crmact:actP13 was initiated by (initiated) CC16 Realization Planning (is a E5) CRM Activity Plans
actE3 Intention to Apply crmact:actP14 was ended by (ended) CC16 Realization Planning (is a E5) CRM Activity Plans
actE4 Event Template crmact:actP25 specifies situation (is specified situation of) CC16 Realization Planning (is a E1) CRM Activity Plans

Profiles using this class

Label Version Status Last updated

Linked classes graph

Use mouse wheel to zoom in/out.

Comments