This property describes the commitment of a group formed to undertake the execution of architectural project for a client. The property serves, therefore, to connect an instance of AR8 Maîtrise d’Oeuvre (MOe) to an instance of AR9 Oeuvre. It is used to indicate the participation on the part of the design-conception-construction team (designers, architects, engineers etc) (AR7) to achieve a specific architectural work through their participation in the project (AR9 Oeuvre). The relation is valid so long as the instance of MOe continues to be so constituted as to will and eventually be able to carry out of the realization of the on-going Oeuvre.